4 ms·
First, I assume that "NEC" means North East Corridor which has a "high speed" train on Boston-NYC-WashingtonDC. Second, "relatively cheap fixes: removing sharp
by throwaway2037 1y ago
First, I assume that "NEC" means North East Corridor which has a "high speed" train on Boston-NYC-WashingtonDC. Second, "relatively cheap fixes: removing sharp curves": You lost me here. That train must be about 20 years old now. If this was so cheap and easy, why not already done?
- biophysboy 1y agoHell if I know why it hasn’t already been done. All I’m saying is that the route slows down because of some sharper turns in some areas, and fixing it would be easier than making completely new lines/stations. I’m sure it would be much more expensive than similar projects elsewhere in the world