3 ms·
Well, while it's hard to transport a 130 meter long windmill blade on a street... the 60 tons of water you'd need to replace it as ballast weight, that's two se
by mschuster91 1y ago
Well, while it's hard to transport a 130 meter long windmill blade on a street... the 60 tons of water you'd need to replace it as ballast weight, that's two semi trucks worth. Easy to get to even the most remote sites, you need heavy machinery (and thus, roads) there anyway to build a foundation capable of supporting a 200m high tower.