2 ms·
But it's not costing me much. My devs still need to be in on planning their own work, and if they're all on the same scrum there should be a lot of overlap. Lis
by vannevar 14y ago
But it's not costing me much. My devs still need to be in on planning their own work, and if they're all on the same scrum there should be a lot of overlap. Listening in on the planning for work entirely unrelated to their own should be pretty rare.