4 ms·
At that ratio a technical manager should be first on every code review, should be testing the hell out of everything, and should be sitting in design reviews ca
by com2kid 1y ago
At that ratio a technical manager should be first on every code review, should be testing the hell out of everything, and should be sitting in design reviews catching bugs well before they hit the IC's plates.
- whatever1 1y agoWith 2 reports one definitely has time for IC work. At 4-5 is where it gets tricky.