4 ms·
I've worked at this plant, I've been in that control room during a refuel outage. I was there back in the 90's to install some feedwater pump vibration monitori
by dmfdmf 14y ago
I've worked at this plant, I've been in that control room during a refuel outage. I was there back in the 90's to install some feedwater pump vibration monitoring equipment when I worked for GE as an engineer. Later went on to design feedwater (level) control systems for other plants. Brings back some great memories.
Edit: I'm just hanging out listening to Giants/Dodgers... if anyone has any questions on the control panel systems, acronyms, etc fire away, I'll try and answer if I can. One memory was the all the acronyms I used to know. AMA