Rules, Not Renewables, Might Explain the Iberian Blackout
- deleted 1y ago[deleted]
- diggan 1y ago> the four official investigations into the cause haven’t yet released their conclusions, and people are still waiting to know the causes of the blackout. Officials themselves have said it'll take months (https://elperiodicodelaenergia.com/el-gobierno-estima-que-su-investigacion-para-esclarecer-las-causas-del-apagon-durara-entre-3-y-6-meses/ https://elperiodicodelaenergia.com/el-gobierno-estima-que-su...) before the report is done, basically saying it won't be until sometime between July and October that we'll know what happened. I kind of feel like there isn't much point in speculation about the reasons until the people who sit on all the data can actually give some definitive conclusions. A bit like guessing why Google/CloudFlare/Amazon went down this time, five minutes into the downtime, and arguing about why it is/isn't DNS/BGP.
- cogman10 1y agoThe problem the OP is talking about is renewable islanding. To be clear, this is a renewable problem, not a rules problem. The problem, put simply, is that renewables don't want to be reactive power sources. It requires additional equipment to properly determine what the frequency of the grid should be (some rely on flywheels, for example) and getting it wrong can be disastrous for the grid and equipment. Effectively, if renewables get it wrong they become a load on the grid rather than a reactive power source. Compounding an active problem. So, what renewables do instead is follow the voltage wave. If the frequency drops, they cut power to avoid causing damage to the grid and other power suppliers. The thing more traditional spinning disk power suppliers will do is simply power through the down voltage. The disks have momentum which means even if they wanted to, they could just stop producing power. This somewhat self corrects a large reactive power surge. Grids do not like doing this. This is why they'll charge more to industrial power users that add highly inductive loads (think electric motors, like a saw). They'll even incentivize having these businesses install capacitor banks to avoid adding inductive loads. The solution is rules, but rules renewable producers have to follow. That's mandatory islanding equipment installs rather than just shutting down power.
- scblock 1y agoRenewables can absolutely provide and consume reactive power through the use of power electronics equipment incorporated into the inverters. All modern utility-scale wind and solar power plants use this type of equipment, and most interconnection requirements in the US require significant reactive power capability as part of the interconnection process. This may require additional reactive power capabilities such as capacitor banks, DVAR units, or reactors at the project substation. This means if grid voltage drops they will provide VARs to increase voltage, and vice versa. They can similarly react to shifts in grid frequency. Only after they reach certain power factor, voltage, or frequency limits will they disconnect from the grid, similar to other generators. If in spain renewable energy projects were somehow exempted from needing to provide a wide range of power factor capability then yes this would be a rules problem. They charge more for inductive loads because of low power factors and significant VAR consumption yes, though you can also do power factor correction on induction motors. And though most wind turbines use induction generators, they are designed to be able to supply power at unity power factor and through a large power factor range. Also, islanding means operating as a standalone grid, which does not happen when the generators shut down, and systems are designed to shut down after a certain number of cycles without grid. This does not sound like islanding at all.
- cogman10 1y agoGood comment and I do not disagree. I wasn't aware that the US had significant reactive power requirements (I'm guessing for utility scale solar). > And though most wind turbines use induction generators, they are designed to be able to supply power at unity power factor and through a large power factor range. Correct me if I'm wrong, but I was under the impression that wind turbines did an AC->DC->AC dance to ultimately get the right power factors and frequencies.
- xenadu02 1y agoRooftop Solar in the US has had such requirements for a long time. More recent systems in CA like mine (IIRC starting in 2018) require an active connection to the grid operator so the operator can override the default exceedance values to permit larger excursions for longer to avoid a cascade where grid instability causes lots of solar capacity to trip, causing further instability, leading to collapse. They can also command solar to stop providing power to the grid if there is an excess in the other direction though legally there is a limit to how often they can do that and for how much total time.
- MaxHoppersGhost 1y ago0% chance European investigators find renewables at fault.
- cogman10 1y agoI see no reason why they wouldn't. Nobody wants an unstable grid and if it's renewables that ultimately killed the grid they'll want to know exactly why and how to prevent it in the future. There are known problems with renewables, but there's also solutions that can be retrofit onto renewables to avoid those problems. Renewable power suppliers won't like those costs because it will cost money.
- ErneX 1y agoThe Spanish government blamed nuclear since the day of the blackout. Red Eléctrica has a government majority stake and they appointed its director (someone with zero energy sector experience by the way) and seeing how they cover every corruption scandal lately I wouldn't be surprised they try to sweep this under the rug as well. Hopefully the EU does a decent investigation though.
- diggan 1y agoThere is still no official explanation so lets not say that the government has "blamed" anything (yet), we have to wait for the official to know what they "blame".
- ErneX 1y agoPresident Sanchez: “These plants, far from being a solution, have been a problem” https://www.eldiario.es/economia/sanchez-manda-mensaje-claro-nucleares-centrales-lejos-solucion-han-sido-problema_1_12256775.html https://www.eldiario.es/economia/sanchez-manda-mensaje-claro... Outright lie specially considering we got power back in huge part thanks to France nuclear power.
- 1y ago
- ErneX 1y agoThey changed the mix since then to have more presence of combined cycle, that should be a hint.
- andy12_ 1y agoIt really is an obvious hint. Anyone can check that since the blackout there is never less than 4000 or 5000 MW of nuclear at all times (compared to 3000 MW of nuclear in the days before the blackout). Also combined cycle. On the day of the blackout there was very little, about 1600 MW. Now there is usually never less than 3000 MW of combined cycle even at peak hours of solar generation. Even in the report they released they talk about how just 10 minutes before the blackout they were scrambling to put online more conventional generators to stabilize the grid (they never had the change to go online before the blackout happened). [1] "At 12:22 h when the system recovers from EVENT 2, it is observed how the system voltage starts to rise, but within the operating margins. In view of this situation, the REE Control Center begins to couple reactors in several substations to counteract this rise. [Likewise, [...] the decision is taken to couple more conventional generation that complies with P.O. 7.4 mainly in the south, asking for coupling times. A CCC group is chosen in Andalusia, which gives 1 h and 30 minutes of coupling time to the grid, technical minimum at 14:00h. This measure was never implemented due to the zero voltage. Coinciding with this decision, a control center reported that a nuclear group was oscillating a lot with the oscillations and that it could trip. As a precautionary measure, advance notice was requested to couple to another CCC group in the North zone. Then, another control center indicated that a CCC group in Andalusia needed between 2 and 2.5 hours to couple and asked to modify the offer to make it cheaper. After this, the first control center confirms that the northern CCC group would couple at 15:00 h. [...] As a result of all the above events, the system was at a very different operating point from the initial one, with low damping and less flexibility in voltage control. [...] The corrective measures taken could not be fully implemented, e.g. synchronization of the two groups." [1] https://d1n1o4zeyfu21r.cloudfront.net/WEB_Incidente_SistemaElectricoPeninsularEspanol_18junio2025.pdf https://d1n1o4zeyfu21r.cloudfront.net/WEB_Incidente_SistemaE...
- AStonesThrow 1y ago[dead]
- jakub_g 1y agoRelevant parallel thread: "Miscalculation by Spanish power grid operator REE contributed to massive blackout, report finds" https://news.ycombinator.com/item?id=44301186 https://news.ycombinator.com/item?id=44301186
- SideburnsOfDoom 1y agoNobody serious thought that this was likely a "renewables" problem. The obvious bandwagoning was obvious.