3 ms·
Hehe, I imagine the back-and-forth between the architects and structural/mechanical/HVAC guys will be glorious.
by hooverd 1y ago
Hehe, I imagine the back-and-forth between the architects and structural/mechanical/HVAC guys will be glorious.
- joeld42 1y agohaha yeah! It feels like a real pain point in the industry right now. Hopefully we can make it easier for communication between design, engineering and construction.
- gervwyk 1y agoWell done for zoning in on this problem. Many will try to solve this with a better email or kanban workflow or internal tooling. It takes some imagination to build something better. This solution looks very creative (i’m not in the industry so would not know what is the normal for this) and congrats on the launch!
- an_aparallel 1y agoBuilding services bow down to their structural overlords, we generally dont have a say unless we absolutely cannot squeeze duct in a given space.