16 ms·
The difference between Finnish and Russian gauge is 4mm IIRC the diff to European standard is closer to 10cm, still doable but a hurdle compared to just drivin
by theshrike79 1y ago
The difference between Finnish and Russian gauge is 4mm
IIRC the diff to European standard is closer to 10cm, still doable but a hurdle compared to just driving a trainload of troops to the middle of Helsinki it's a bit harder
- dotancohen 1y ago> The difference between Finnish and Russian gauge is 4mm What is the acceptable tolerance? It doesn't sound like a huge engineering effort to design a boogie compatible with both without requiring switching.
- anticensor 1y agoYes, the acceptable tolerance is -4mm+7mm.
- iggldiggl 1y agoWhere? Finland specifically, or elsewhere? Both my local tram system in Germany as well as DB as the national infrastructure operator in Germany have construction tolerances of only +/- 2 mm. Maintenance tolerances on the other hand can be quite a bit larger, at least in the plus direction (on the order of 15/20/25 mm).
- lazide 1y agoSure, but thats Germans. I'm surprised it isn't specc'd in 10ths.
- anticensor 1y agoThey should've specced 1435mm±410µm, with no broadening at curves.
- deleted 1y ago[deleted]
- deleted 1y ago[deleted]
- theshrike79 1y agoI just wish the Germans would be as accurate with their train schedules as they are with their rail gauge tolerances :D
- CapitalistCartr 1y agoTrain tracks are normally not precise to within 4mm anyway, and wheels are wide enough to tolerate that.
- iggldiggl 1y ago> Train tracks are normally not precise to within 4mm anyway Yes they are. Of course practical tolerances including allowances for wear and there are large enough that things can be made to work, but in terms of nominal construction tolerances for example, 4 mm can easily eat up all your construction tolerances or even exceed them.
- sidewndr46 1y agoI obviously don't have a in depth knowledge of Finnish rail, but have you ever looked at rail in the US? I can show you tracks with completely missing ties. Tracks that move vertically by a foot when the train goes over them. Tracks that visually snake all over the place. The difference is made by slowing down the train. Derailment at 3 mph rarely matters. The biggest risk is the conductor doesn't know it happened & continues to drag the car along the tracks
- iggldiggl 1y agoSure, but even in the US that infrastructure state is usually only found on minor branch lines (shortlines), not on the main lines.
- orthoxerox 1y agoThere used to be a St.Pete-Helsinki high-speed train before the war, Allegro. It was built with bogies for a 1522mm gauge.
- T-A 1y agoFirst sentence from the article: The Finnish government has announced the conversion of its rail network from Russian gauge (1,524 mm) to European standard (1,435 mm). 1524 - 1435 = 89 https://en.wikipedia.org/wiki/5_ft_and_1520_mm_gauge_railways https://en.wikipedia.org/wiki/5_ft_and_1520_mm_gauge_railway... https://en.wikipedia.org/wiki/Standard-gauge_railway https://en.wikipedia.org/wiki/Standard-gauge_railway
- ta1243 1y agoSo "closer to 10cm" then Clearly not "doable", without guage changing bogies.
- eqvinox 1y agoThe really annoying thing is that it's too close for "simple" dual gauge rails (e.g. 1435 + 1000); 1435 + 1524 is possible and in fact exists (e.g. the one single SE-FI railway bridge that exists is dual guage: https://openrailwaymap.org/?style=gauge&lat=65.82732045370813&lon=24.152820110321045&zoom=15 https://openrailwaymap.org/?style=gauge&lat=65.8273204537081...), but AFAIK it's expensive because the mounts interfere and need to be quite custom.
- ta1243 1y agoThat bridge is 4-rail, not 3-rail https://en.wikipedia.org/wiki/Torne_River_Railway_Bridge#/media/File:Haparanda-Tornio_rail_bridge_Sep2008.jpg https://en.wikipedia.org/wiki/Torne_River_Railway_Bridge#/me... Even if you were to 4-rail every line, you'd potentially run into loading gauge issues (you would have to offset the current centre of the bogies, go too far one way and you collide with platforms, too far the other way and you collide with oncoming trains)
- eqvinox 1y agoBleh, but kinda confirms my point too. I do think there are some 3-rail setups in other border regions though? I should check… then again it doesn't matter that much if it's 3 or 4. As for the loading gauge, yes, of course. On the plus side, this is Finland, most of the lines is in the middle of nowhere and single track even. Maybe the best option for them is to just build 1435 in parallel whereever possible, and just merge where not otherwise practical (bridges, tunnels, populated areas & stations). I don't even think it's that infeasible considering Finland's layout. I'd wager there are only a handful of specific locations that need expensive work.