3 ms·
The operating speed on the fast stretch is actually one of the fastest in the world at 350 km/h, it's just that it has to waste half an hour on the Caltrain tra
by porphyra 1y ago
The operating speed on the fast stretch is actually one of the fastest in the world at 350 km/h, it's just that it has to waste half an hour on the Caltrain tracks from San Francisco to Gilroy and from Burbank to Anaheim. It's kinda like how the TGV from Paris to Nice goes from Paris to Marseille super fast but then has to spend hours to go from Marseille to Nice even though the latter part is a small fraction of the distance.
And yes, I agree that this "blended" design that has a lengthy slow section is very lame and bad. If only Caltrain could be quad tracked elevated viaducts.
- deleted 1y ago[deleted]
- decimalenough 1y agoThis is actually a very common operating pattern, particularly for new services. It took years after initial service opened for the Korean KTX to run all the way from Seoul to Busan, and both France and Japan have a number of TGV/Shinkansen services where part of the line is regular track running at regular speed: https://en.wikipedia.org/wiki/Mini-shinkansen https://en.wikipedia.org/wiki/Mini-shinkansen
- yongjik 1y agoCA should've just bitten the bullet and built the whole SF-SJ section underground. It's about 50 miles, about the length of one mid-sized subway line in many part of the world, and it would've simplified the issue of acquiring prime suburban land. Besides, I just don't see how HSR and Caltrain can share the same railway and avoid major service capacity issues. I think Caltrain is close to capacity as is, and at least a few years ago, major (an hour or more) delays were common. South Korea built its second branch of HSR reaching Seoul almost entirely underground, with a single 31-mile tunnel [1]. I guess it was faster than trying to acquire land on top of it. [1] https://en.wikipedia.org/wiki/Yulhyeon_Tunnel https://en.wikipedia.org/wiki/Yulhyeon_Tunnel
- stephen_g 1y agoThat's still something that wouldn't be that difficult to change in the future. Probably easier to fund once the initial system is operational and the case for the extra expenditure is clearly demonstrable. Having it connect into Caltrain is probably something that is nice to have anyway (like if there's maintenance required in the hypothetical tunnel or whatever kind of direct bypass, so you can still run services on the slower route) so it's not a waste to have both.
- nostrademons 1y agoThe geology of the Bay Area would make that difficult. The Peninsula flats are mostly loosely-consolidated sediment, and in some areas you have less than half a mile between the mountains and the Bay. And it's less than 2 miles from the San Andreas fault. You'd likely have significant problems with flooding [1], and all the difficulties that the Pacheco Pass segment is having tunneling through an active fault would be multiplied by the 4x as long, geologically varied segment from SJ-SF. [1] This is a significant issue for the NYC subway, even though you don't really think of NYC as being on top of a bay.
- LargoLasskhyfv 1y agoThe Japanese would probably say 'Hold my beer.' to that. Because of https://en.wikipedia.org/wiki/Seikan_Tunnel https://en.wikipedia.org/wiki/Seikan_Tunnel
- nostrademons 1y agoI mean, the Seikan tunnel was pretty difficult too: > Following several decades of planning and construction, the tunnel opened on 13 March 1988. > The construction cost of the tunnel itself was 538.4 billion yen at the planning stage, but it actually cost 745.5 billion yen. The construction cost of the strait line, including the attachment line, was 689 billion yen at the planning stage, but ended up costing 900 billion yen. During the construction, 34 workers were killed in the Seikan Tunnel, mostly in transportation accidents > In addition, the tunnel faced criticism for its high maintenance costs, the need to pump a large amount of spring water even after completion, and that the large investment to build it is regarded as a sunk cost, and it is said that it is more economical to abandon it. It was ridiculed variously as "Showa's Three Idiots Assessment", "useless long things", and "quagmire tunnel". We're complaining about CAHSR being decades in the making and billions over budget, but this does not seem to be unique to CAHSR. At least nobody's died during construction yet. It's good evidence that all civil engineering projects are failures right up until they're done and everybody uses them, and then they just become critical infrastructure.