3 ms·
> In 2024, 3,100 GWh of fully commissioned battery-cell manufacturing capacity was online, more than 2.5x that of annual demand. This has driven massive demand
by toomuchtodo 2y ago
> In 2024, 3,100 GWh of fully commissioned battery-cell manufacturing capacity was online, more than 2.5x that of annual demand. This has driven massive demand growth for EVs and stationary energy storage (BESS) systems globally, with China continuing to dominate.
The storage trajectory curve continues to steepen.