3 ms·
You put it at the top when you build it and add servers as you grow. Traditionally.
by namibj 2y ago
You put it at the top when you build it and add servers as you grow. Traditionally.
- jeffrallen 2y agoRight, but good luck routing the 100 gig DAC cable (absolute max length 3 m, but cheaper and more reliable at 1.5 m) 12 inches horizontally, 40 U vertically and then another 12 horizontally. This is why switches are in the middle of the rack.