5 ms·
.....something something, to bring costs to 3 or 4 times that of conventional cells by 2027 with the presumption that they can even build cells in the "convent
by metalman 2y ago
.....something something, to bring costs to 3 or 4 times that of conventional cells by 2027
with the presumption that they can even build cells in the "conventional" sizes
stuck at 30cm width and need to get to 100cm/40”
and, they are rolling out pervoskerite, which needs to be perfectly sealed, the sealant and
pervoskerit materials have no track record.
the money is of the government hand out variety