4 ms·
I built my block foundation in 4 weekends. I would use a truck for footings and grout next time as mixing and wheel barrowing 300 60# bags of quikrete was brut
by ty6853 2y ago
I built my block foundation in 4 weekends. I would use a truck for footings and grout next time as mixing and wheel barrowing 300 60# bags of quikrete was brutal. Total cost was <4000, but that includes excavator rental and site prep. If you hire a truck i think it is difficult to handle that much without help and you are fucked if it sets too soon.
A concrete truck would not even make it down my road though... and many of the blocks were carried in small bundles by 4x4 truck. Building a road for heavy trucks would probably cost as much as the house.
- potato3732842 2y ago> If you hire a truck i think it is difficult to handle that much without help and you are fucked if it sets too soon. Foundations, walls and footings are cake because they're all formed, you just gotta finish the top. It's the flatwork that has lots of finished area for volume and is very laborious