It seems that in our country (The Netherlands) the bigger blocker is more the interconnections between local regions as opposed to transferring between larger r
by spockz 2y ago
It seems that in our country (The Netherlands) the bigger blocker is more the interconnections between local regions as opposed to transferring between larger regions such as countries. We have varying production from solar and wind. Now that means that each local connection to the main grid needs to be almost as heavy as the main grid whereas it used to be just one direction with very predictable usage.