3 ms·
Additionally every single new construction I've seen in greater Boston metro area in the past 20 years has not brought in any pre-assembled elements from outsid
by foobarian 2y ago
Additionally every single new construction I've seen in greater Boston metro area in the past 20 years has not brought in any pre-assembled elements from outside. Just piles of various sizes of lumber and assemble on-site.
(Edit: to be clear this is for residential construction which tend to be small 1-2 story buildings.)
- pfdietz 2y agoHere's an example of a Boston area builder doing just that. https://www.youtube.com/watch?v=2f4nqf_HgnY https://www.youtube.com/watch?v=2f4nqf_HgnY
- foobarian 2y agoSure but I don't buy it's being done at scale. Even in that video they are mentioning an unusual design as a partial reason for the pre-fabbed elements.