Even if you’re generally suspicious of so called best practice/ design patterns / Martin Fowlerisms.. this is a time for the strangler approach. (Parent and sib
by photonthug 2y ago
Even if you’re generally suspicious of so called best practice/ design patterns / Martin Fowlerisms.. this is a time for the strangler approach. (Parent and siblings are already talking about the same idea without naming it.)
Rewrites from scratch never work with sufficiently large systems, and anyone that’s been involved with these things should be savvy enough to recognize this. The only question is around the exact definition of sufficiently large for a given context.
https://en.m.wikipedia.org/wiki/Strangler_fig_pattern https://en.m.wikipedia.org/wiki/Strangler_fig_pattern
- mjr00 2y agoA similar, more concrete approach is parallel implementations, as written about by John Carmack[0]. I suppose the main difference is that parallel implementation has you very explicitly and intentionally leave the "old stuff" around until you're ready to flip the switch. I've used this approach in large-scale refactorings very successfully. One of the benefits is that you get to compare the new vs old implementation quickly and easily, and it lets you raise questions about the old implementation; every time I've done this I've found real, production-impacting bugs because the old system was exhibiting behaviors that didn't match the new system, and it turned out they weren't intentional! [0] http://sevangelatos.com/john-carmack-on-parallel-implementations/ http://sevangelatos.com/john-carmack-on-parallel-implementat...
- Tknl 2y agoI second this approach. I've utilized it successfully in an ongoing migration. I also second the need to have engineering knowledge from the previous system available. I was lead for 5 years on a previous system before being tasked as solution architect of new total rewrite to cloud native. The hardest part of such a migration is maintaining sponsor buy-in while you build the parallel run evaluation strangler fig integration with the old system and get some existing flow polished enough to take live. If you happen to have a rule or scripting system in place piggy pack off of it so you can do an incremental migration.