3 ms·
Our engineers feed a LLM engineering plans as a quality control. Not as a replacement of any of the regular process, simply as an additional step. It discovered
by devjab 2y ago
Our engineers feed a LLM engineering plans as a quality control. Not as a replacement of any of the regular process, simply as an additional step. It discovered what would’ve been a fairly serious error in some component design for one of our energy plants that nobody else had caught. Similarity it “fact checked” one of our subcontractors on something with cable sizes that I honestly don’t understand. Finding a better option than what the subcontractor was suggesting. I say “fact checked” because you shouldn’t think of it as that since everything it outputs need to be actual fact checked.
I mostly view LLMs as advanced auto-complete for what I do and haven’t been very impressed by them, but some of the examples our engineers show us are wild.
- jazzyjackson 2y agoThanks. I actually do have a workflow that would benefit from feeding an LLM the data corresponding to 4 'stages' of an order in varying formats. Having a computer flag inconsistencies sounds feasible.