4 ms·
Why? After cutting the power to them I'd tell the company if they wanted them back I can take them down and ship them back at my standard rate of $500/hr
by sidewndr46 2y ago
Why? After cutting the power to them I'd tell the company if they wanted them back I can take them down and ship them back at my standard rate of $500/hr
- deleted 2y ago[deleted]