2 ms·
Which is why the UK is putting in subsea cables between Scotland and England despite the added cost.
by barbegal 2y ago
Which is why the UK is putting in subsea cables between Scotland and England despite the added cost.
- samwillis 2y agoYep, there are on-shore plans, but there is a lot of NIMBYism that results a resistance to these necessary projects.
- seszett 2y agoWell I find it understandable. I was recently looking for a terrain to build a house and I didn't choose the one that was within the area for the new high voltage power line that they're planning. I bought another terrain in a slightly less interesting place nearby, but that is definitely not on the path of the power line. I think it's a normal reaction.