> There's no transmission capacity What is "transmission capacity"?
by mcphage 2y ago
> There's no transmission capacity
What is "transmission capacity"?
- alwa 2y agoInfrastructure to physically carry the energy away from the power station, aggregate it with other stations’ energy, and transmit it safely to the customers who can use it. To tie in a major new source of energy, you need to make sure the wires and stuff can handle it, which involves physical construction and planning at a level above an individual operator. The US regulator estimates that 2,500GW of clean energy projects, like this one, are already built and stuck in the backlog of interconnection requests. [0] https://www.energy.gov/eere/wind/articles/transmission-interconnection-roadmap-offers-plan-clear-queues-clean-energy https://www.energy.gov/eere/wind/articles/transmission-inter...
- mcphage 2y agoSo you're saying that they built a power plant, but didn't build enough infrastructure to transmit the power from that plant to the main power grid? That does seem to fit in with the idea that this was merely a greenwashing project, and not an actual effort.