This is old news, but what's new news is that last week, the UK Civil Aviation Authority openly published its Independent Review of NATS (En Route) Plc's Flight
by amiga386 2y ago
This is old news, but what's new news is that last week, the UK Civil Aviation Authority openly published its Independent Review of NATS (En Route) Plc's Flight Planning System Failure on 28 August 2023 https://www.caa.co.uk/publication/download/23337 https://www.caa.co.uk/publication/download/23337 (PDF)
Let's look at point 2.28: "Several factors made the identification and rectification of the failure more protracted than it might otherwise have been. These include:
• The Level 2 engineer was rostered on-call and therefore was not available on site at the time of the failure. Having exhausted remote intervention options, it took 1.5 hours for the individual to arrive on-site to perform the necessary full system re-start which was not possible remotely.
• The engineer team followed escalation protocols which resulted in the assistance of the Level 3 engineer not being sought for more than 3 hours after the initial event.
• The Level 3 engineer was unfamiliar with the specific fault message recorded in the FPRSA-R fault log and required the assistance of Frequentis Comsoft to interpret it.
• The assistance of Frequentis Comsoft, which had a unique level of knowledge of
the AMS-UK and FPRSA-R interface, was not sought for more than 4 hours after
the initial event.
• The joint decision-making model used by NERL for incident management meant
there was no single post-holder with accountability for overall management of the incident, such as a senior Incident Manager.
• The status of the data within the AMS-UK during the period of the incident was not clearly understood.
• There was a lack of clear documentation identifying system connectivity.
• The password login details of the Level 2 engineer could not be readily verified due to the architecture of the system."
WHAT DOES "PASSWORD LOGIN DETAILS ... COULD NOT BE READILY VERIFIED" MEAN?
EDIT: Per NATS Major Incident Investigation Final Report - Flight Plan Reception Suite Automated (FPRSA-R) Sub-system Incident 28th August 2023 https://www.caa.co.uk/publication/download/23340 https://www.caa.co.uk/publication/download/23340 (PDF) ... "There was a 26-minute delay between the AMS-UK system being ready for use and FPRSA-R being enabled. This was in part caused by a password login issue for the Level 2 Engineer. At this point, the system was brought back up on one server, which did not contain the password database. When the engineer entered the correct password, it could not be verified by the server. "
- mcfedr 2y agoBut no mention of this insane failure mode? If the article is to be believed
- amiga386 2y agoI'm not sure what you think is the insane failure mode? The UK is part of the IFPS Zone, centrally managed by EUROCONTROL using AFTM. IFPS can accept/reject IFR flight plans, but the software at NATS can't. By the time NATS gets the flight plan, it has already been accepted. All their software can do is work out which parts enter the UK's airspace. If it's a long route, the plane has already taken off. NATS aren't even thinking of a mixed-mode approach (for IFR flight plans) where they have both automated processing and manual processing of things the automated processing can't handle. They don't have a system or processes capable of that. And until this one flight, they'd never had a flight plan the automated system couldn't handle. The failures here were: 1) a very unlikely edge case whose processing was specified, but wasn't implemented correctly, in the vendor's processing software 2) no test case for the unlikely edge case because it was really _that_ unlikely, all experts involved in designing the spec did not imagine this could happen 3) they had the same vendor's software on both primary and secondary systems, so failover failed too; a second implementation might have succeeded where the first failed, but no guarantees 4) they had a series of incident management failures that meant they failed to fix the broken system within 4 hours, meaning NATS had to switch to manual processing of flight plans
- mcfedr 2y agoBut that's the thing, part of the plan was in a bad case we can switch to manual processing, but at no point someone thought to suggest manually processing one failing plan I work with great QAs all day, and if one of them heard that there are duplicate area codes, there would be a bunch of test cases appearing with all the possible combinations
- dx034 2y ago> The Level 2 engineer was rostered on-call and therefore was not available on site at the time of the failure. Having exhausted remote intervention options, it took 1.5 hours for the individual to arrive on-site to perform the necessary full system re-start which was not possible remotely. Which shows that sometimes, remote isn't a viable option. If you have very critical infrastructure, it's advisable to have people physically very close to the data center so that they can access the servers if all other options fail. That's valid for aviation as well as for health care, banks, etc. Remote staff just isn't enough in these situations.
- jjk166 2y agoOr you configure your infrastructure to be remotely operated.