4 ms·
Baseload power comes at the expense of renewable power, the latter of which is much cheaper, much faster, and less riskier to deploy than nuclear. Peaking gas
by h0l0cube 2y ago
Baseload power comes at the expense of renewable power, the latter of which is much cheaper, much faster, and less riskier to deploy than nuclear. Peaking gas plants are much quicker to build than nuclear and should tide us over until grid storage (of all kinds) catches up – which looks to be around 1-2 decades at current scaling and about the lead time for a nuclear power plant