3 ms·
Great article. That bit about having 20% free at the start to 90-100% free time towards the end of a project, to address issues, is very insightful. I stumbled
by tecoholic 2y ago
Great article. That bit about having 20% free at the start to 90-100% free time towards the end of a project, to address issues, is very insightful. I stumbled a lot in a project recently because I suspect I had it the other way round.