4 ms·
First prototype (and what was likely also shot down) has been flown on 2017, so at that time MAX22200 were still available. Getting Maxim today is difficult, bu
by MrHamburger 2y ago
First prototype (and what was likely also shot down) has been flown on 2017, so at that time MAX22200 were still available. Getting Maxim today is difficult, but maybe buying unsold devkits and reusing chips from them would be easier than redesigning that electronic module which uses them. But it is a desperation move which I would be protesting against, even on consumer-grade electronics.
- tzs 2y agoAre they difficult to get today? DigiKey says [1] they have almost 2000 ready to ship immediately. [1] https://www.digikey.com/en/products/detail/analog-devices-inc-maxim-integrated/MAX22203ATU/14317238 https://www.digikey.com/en/products/detail/analog-devices-in...