4 ms·
They've done some groundworks for the entire length, but that's shifting sand about mostly for PR reasons. I believe the plan is to build the first 2km as a te
by Oarch 2y ago
They've done some groundworks for the entire length, but that's shifting sand about mostly for PR reasons.
I believe the plan is to build the first 2km as a test. Which is still 500m high so just nuts.
The project Corviale in Rome is 1km long as a reference.