3 ms·
The regional planning organization in my area uses a metric called Level of Traffic Stress: https://www.dvrpc.org/webmaps/bike-lts/ https://www.dvrpc.org/webmap
by ryukafalz 2y ago
The regional planning organization in my area uses a metric called Level of Traffic Stress: https://www.dvrpc.org/webmaps/bike-lts/ https://www.dvrpc.org/webmaps/bike-lts/
And they made a routing tool based on this: https://www.dvrpc.org/ruti/ https://www.dvrpc.org/ruti/
- aidenn0 2y agoUsing the metric from the documentation[1] they would both be LTS-3 with Road B varying from 42% to 60% and Road A at 50%: Both are over 35MPH; Road A is 2 lanes with an unbuffered bike lane and Road B is 4 lanes with most (but not all) stretches having a buffered bike lane. 1: https://www.dvrpc.org/webmaps/bike-lts/pdf/bikestressdocumentation_phase3_11-10-21.pdf https://www.dvrpc.org/webmaps/bike-lts/pdf/bikestressdocumen...