3 ms·
It's presumably not practical to find a multi-GW load to test with aside from the grid. The plant probably had arrangements in place if things didn't work out.
by Panzer04 2y ago
It's presumably not practical to find a multi-GW load to test with aside from the grid. The plant probably had arrangements in place if things didn't work out.