3 ms·
Google purchases nuclear energy from Kairos Power SMRs
- espadrine 2y agoFive years to build each SMR is faster than what it takes to build a typical EPR (from 10 to 20 years), but it is still longer than what I expected. Besides, the 5-year figure might have overruns as they work through regulatory hoops towards a permit. Nevertheless, before even having one built, it will allow Google to say that large model training will eventually not produce CO2.
- brudgers 2y agorecently, https://news.ycombinator.com/item?id=41840769 https://news.ycombinator.com/item?id=41840769