3 ms·
Fair point, most projects I do are prototypes and concepts for ideas I have. Up to 2000 lines of code, built from scratch. The mode of work is me commanding 95%
by freediver 2y ago
Fair point, most projects I do are prototypes and concepts for ideas I have. Up to 2000 lines of code, built from scratch. The mode of work is me commanding 95% of the time and coding about 5%.