4 ms·
Not quite the same thing as none of those items really have an undue cost to the facility - ramps (when needed, a lot of those stores are built level to the par
by Anechoic 14y ago
Not quite the same thing as none of those items really have an undue cost to the facility - ramps (when needed, a lot of those stores are built level to the parking lot/sidewalk) can be used for the disabled as well as store workers/delivery workers moving heavy items on dollies/hand trucks, custom bathroom stalls are basically just larger stalls, and special parking spots are just normal parking spots that with a slightly different paint job. There's not much extra effort that goes into these items.
This move would me more akin to requiring Wal-Mart to attach braille price stickers to every individual item in the store.
- chime 14y ago> There's not much extra effort that goes into these items. Special parking spots easily cost 1% more than regular parking spots because of the markings on ground and the metal signage. That fits into the excessive cost range that the original parent post was against. I do like your analogy of braille on every item. I think make something accessible should mean accessible not perfectly suited in the best environment. That is, you should make your site/app accessible to e-readers, not be required to make a whole another custom UI just for e-readers.
- Anechoic 14y ago> Special parking spots easily cost 1% more than regular parking spots because of the markings on ground and the metal signage. Eh, I don't know that it would even be 1% more - for a construction project most of the cost comes from the mobilization of equipment and prep work. For the construction of a parking lot, you have excavation, installation of drainage, installaction of subgrade, paving, curbing, signage, and line painting, all of which take a week of more for a decent sized lot. When it comes time to lay out the HPV sport, the line-spraying and post-hole digging equipment is already there, it's just applied differently. I'd be shocked if it were even a 1% difference. In any event, given that the contingency on construction projects is typically 5% to 10%, so even 1% is insignificant. But we're in the weeds here ;)