3 ms·
There is a way, which is through buildout enforcement. Basically, if you don't meet buildout deadlines and cover x% of pops within a specific time period, you f
by darksaints 2y ago
There is a way, which is through buildout enforcement. Basically, if you don't meet buildout deadlines and cover x% of pops within a specific time period, you forfeit the license. It should probably be a lot more stringent and with tighter deadlines, but the mechanism already exists.
It hasn't ever really been an issue with any spectrum that they've bought in the past, and it has only ever been a concern with mmWave spectrum, because the costs of coverage are much higher than were ever anticipated with their tiny effective ranges. Anything below 3GHz seems to get built out and used extremely quickly.
- glzone1 2y agoDish I think is sitting on a bunch with endless extensions
- plussed_reader 2y agoI think of the 20B+ the shambling humonculus AT&T has pocketed for fiber deployment and think the process is captured.
- JumpCrisscross 2y ago> if you don't meet buildout deadlines and cover x% of pops within a specific time period, you forfeit the license The issue you have to surmount is this reduces the value of the licenses in the short run. Which means less cash for the seller (the public) now versus a recurring productive asset. The useless response is to decry hyperbolic discounting. A productive response would think through how to design the auction such that the public would prefer to have the productive, recurring stream of revenue versus some shiny thing today.
- bastawhiz 2y ago> The issue you have to surmount is this reduces the value of the licenses in the short run. Which means less cash for the seller (the public) now versus a recurring productive asset. Well, that assumes the public isn't really benefiting from the products and services that can actually take advantage of that spectrum. Making less in license fees is probably a good trade-off if your phone is faster or you get interesting and affordable satellite services.
- joecool1029 2y ago> There is a way, which is through buildout enforcement. LOL, DISH squatted nationwode spectrum for years and it wasn't until the tmo/sprint merger that they did more than build a single tower in Colorado. I don't think I've ever seen the FCC seriously enforce the buildout requirements since any license holder can say 'but its hard we need more time/money'