Pretty good for a rough estimate! The best I could find was a document by the National Audit Office from 2017 (using 2016 estimates); page 18, figure 2 - The e
by duckmysick 2y ago
Pretty good for a rough estimate!
The best I could find was a document by the National Audit Office from 2017 (using 2016 estimates); page 18, figure 2 - The expected costs of Hinkley Point C.
https://www.nao.org.uk/wp-content/uploads/2017/06/Hinkley-Point-C.pdf https://www.nao.org.uk/wp-content/uploads/2017/06/Hinkley-Po...
Back then the construction was estimated at £18.2 billion. Ongoing operation costs (including fuel, staffing, and grid charges) were priced at £29.3 billion and decommissioning (without the uplift) at £7.3 billion. Total project cost was put at £54.8 billion.
Again, it was from 2017 so things have changed.
- chickenbig 2y agoThe report states plant decommissioning is 2.7B GBP and ILW disposal is 0.3B GBP. That sort of agrees with https://www.eia.gov/todayinenergy/detail.php?id=33792 https://www.eia.gov/todayinenergy/detail.php?id=33792 which puts PWR at perhaps 1B USD per plant. Handling and disposing on the used fuel is 4.4B GBP (or 73M GBP per year of running, or 2.6 GBP per MWh of electricity). Cheap!