3 ms·
There was a plan to convert the Cockenzie site into an assembly site for offshore wind turbines. I don't think that quite got there, but it now looks like there
by pjc50 2y ago
There was a plan to convert the Cockenzie site into an assembly site for offshore wind turbines. I don't think that quite got there, but it now looks like there are plans to use it for landing offshore generation cables and for battery storage. Which is very fitting.
https://www.eastlothian.gov.uk/info/210547/planning_and_building_standards/12312/former_cockenzie_power_station https://www.eastlothian.gov.uk/info/210547/planning_and_buil...
- goodcanadian 2y agoMakes sense . . . the grid infrastructure is already in place at that site.