Pure PV farms have minimal operational costs, nuclear has huge ongoing costs. For a more realistic comparison the operating costs of nuclear offset the cost of
by Retric 2y ago
Pure PV farms have minimal operational costs, nuclear has huge ongoing costs. For a more realistic comparison the operating costs of nuclear offset the cost of batteries for solar.
So capital costs vs capital costs on a per Wh basis isn’t in favor of Solar it favors nuclear which has less flexibility. IE: 24 GWh per day of battery backed solar can dump half that power over 2 hours @ 6GW. 24GWh of nuclear IE a 1GWh reactor caps out at 1GW. If you want to ramp to 6GW of output nuclear needs several nuclear reactors and all of their associated costs.
> Modern reactors have load following capabilities
Load following isn’t free for nuclear, any time you’re not operating at 100% you’re losing money. Batteries are inherently way more flexible.
It also costs more to build a load following reactor and they have more experience maintenance issue due to thermal stress. Nuclear inherently favors steady state operations due to the Xe pit (https://en.wikipedia.org/wiki/Iodine_pit https://en.wikipedia.org/wiki/Iodine_pit) but it also requires being taken offline for long periods for maintaining, refurbishing, and or refueling.
- chickenbig 2y ago> Pure PV farms have minimal operational costs, nuclear has huge ongoing costs. https://www.iea.org/reports/projected-costs-of-generating-electricity-2020 https://www.iea.org/reports/projected-costs-of-generating-el... page 59 table 3.13a puts O&M for nuclear in the USA at about 12 USD/MWh plus just over 9 USD/MWh for fuel, and table 3.14 puts O&M for utility scale solar at around 6 USD/MWh or so. As for batteries, I think a few hundred USD/kWh is a reasonable guesstimate of cost (raw LiFePO4 cells are now sub-100 USD/kWh). Backing up each hour of production of a 1GW power station would cost a few hundred million USD, plus the cost of the solar farm to charge the battery up. > 24 GWh per day of battery backed solar can dump half that power over 2 hours @ 6GW At which point the transmission becomes the limitation; the grid operator probably wants a fairly stable flow of electricity through the wires to maximise utilisation so the 6GW is not realistic, nor would moving the electricity during the day to load-adjacent storage be efficient. > Load following isn’t free for nuclear, any time you’re not operating at 100% you’re losing money. I was responding to the point that solar panels are inherently more flexible because you can turn them off (because ...????). The same reasoning you've made about nuclear load following being uneconomical can be made about pure solar too. > Nuclear inherently favors steady state operations due to the Xe pit Operators change the boron concentration to offset the negative change in reactivity due to Xe-135 levels. For PWRs this is not a big problem, you just have to know it is there and do the calculation for I/Xe concentrations given the power levels.
- Retric 2y agoI disagree with your quoted numbers. They aren’t current or inflation adjust to the same year, they also exclude several costs associated with nuclear such as insurance and setting money aside for decommissioning. Ex: Your quoted fuel costs would be 0.9c/kWh in (2020 publish date) = 1.3c/kWh in 2024. O&M is often quoted as 4x fuel costs so 5.2kWh. “Fuel costs account for about 28% of a nuclear plant's operating expenses.” https://en.wikipedia.org/wiki/Economics_of_nuclear_power_plants https://en.wikipedia.org/wiki/Economics_of_nuclear_power_pla... A battery system which costs 200$/kWh and does 5,000 cycles = 5c/kWh. (Not every kWh from a solar farm needs to be stored, but this is just a ballpark comparison.) > At which point the transmission becomes the limitation; the grid operator probably wants a fairly stable flow of electricity through the wires to maximise utilisation You’re missing the forest for the trees here. Utilization follows demand, a state with peak demand of 6GW is going to have transmission lines setup for 6GW. But comparing the options you have nuclear with 4x 1.5GW reactors averaging ~40% utilization or batteries backed by solar. Run the numbers and Solar wins by a landslide.
- chickenbig 2y ago> They aren’t current or inflation adjust to the same year Page 41 states All costs are reported here in 2018 USD terms. > several costs associated with nuclear such as insurance Insurance is required for any industrial facility. The IEA report does not mention insurance. https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/liability-for-nuclear-damage https://world-nuclear.org/information-library/safety-and-sec... puts insurance costs at around 1M USD/year (and separate conditional payments if an accident does happen), which divided by 9M MWh/reactor does not work out to much. > setting money aside for decommissioning For nuclear between 0.01 and 0.39 USD/MWh, and solar between 0.03 and 0.58 USD/MWh (depending on discounting). > O&M is often quoted as 4x fuel costs The data in the IEA report differs; it is somewhere between the fuel costs and twice the fuel costs. > Not every kWh from a solar farm needs to be stored Rooftop solar will cannibalise the utility solar's daytime market. The demand for utility solar's energy will for the most part occur when the sun does not shine. > a state with peak demand of 6GW is going to have transmission lines setup for 6GW. But this ignores the physicality of the grid; power stations are dispatched based on location as well as availability because transmission is expensive to build and limited in capacity. > you have nuclear with 4x 1.5GW reactors averaging ~40% utilization So your demand model is 2GW for 22 hours and 6GW for 2 hours, right? Are there many places which exhibit such wild swings? Dynamic pricing/load shifting, pumped hydro and OCGTs would be the traditional solutions.