4 ms·
Stoke awarded contract to develop space mobility capabilities
- ortusdux 2y agoI really like their actively cooled heat shield design - https://www.youtube.com/watch?v=3V6lfs7xFJM https://www.youtube.com/watch?v=3V6lfs7xFJM Tour: https://youtu.be/EY8nbSwjtEY https://youtu.be/EY8nbSwjtEY
- consumer451 2y agoWe live in such interesting times regarding space. Between Stoke, Rocket Lab, and SpaceX, we have three fully reusable launch vehicles being built today! I am really excited about Stoke. They have done so much on a relatively limited budget. For anyone unfamiliar with Stoke, here is a great recent interview with CEO, Andy Lapsa: https://mainenginecutoff.com/podcast/284 https://mainenginecutoff.com/podcast/284
- bryanlarsen 2y agoI don't believe Rocket Lab is designing a fully reusable vehicle. Relativity is, though, and Blue Origin is working on the fully reusable Jarvis. There is also at least one Chinese firm working on a fully reusable vehicle.
- consumer451 2y agoThey are. They call it Neutron. [0] The reason that I didn’t include Blue is that AFAIK, it is not being manufactured at the moment, unlike the other three. https://www.rocketlabusa.com/launch/neutron/ https://www.rocketlabusa.com/launch/neutron/
- bryanlarsen 2y agoNeutron is not fully reusable. The second stage is thrown away. It's a good design for partly resuable, though -- the second stage is tiny, and the fairings are part of the first stage rather than separating. > The reason that I didn’t include Blue is that AFAIK, it is not being manufactured at the moment, unlike the other three. Neutron, Relativity R and Stoke aren't being manufactured yet either, so I'm not sure what the distinction is.
- ortusdux 2y agoBlue Origin is developing both reusable and non-reusable 2nd stages in tandem: "We're also working on a reusable second stage. Right. 46:20 And we're gonna let that be a horse race. So the, the goal for the expendable stage is to become 46:26 so cheap to manufacture that reusability never makes sense. Awesome. And the goal for the reusable stage is to become 46:35 so operable that exp expandability never makes sense. And so it's, and we will see 46:41 because when you do that trade on paper, it just isn't obvious. Right. Right. 46:47 On the first stage it's blindingly obvious. Right, right, right. Yeah. It's like the bulk of 46:54 the cost. - It's lowest velocities. Yeah. Correct. It's everything lines up for reusability. Yeah. 47:01 For the second stage, it's an interesting horse race. Yeah. So we're just gonna go barreling down both paths. 47:09 And try to figure out which one is better. Really. Yeah. And 'cause it's just about cost. - At the end 47:15 of the day. Yeah. At the end of the day it's just about cost - Are where you actually at in terms of that second stage, the reusable second stage." https://youtu.be/rsuqSn7ifpU?si=4_cm2khyEP0as4aF&t=2771 https://youtu.be/rsuqSn7ifpU?si=4_cm2khyEP0as4aF&t=2771
- joshu 2y agostill kicking myself for passing on this one when i had the chance
- rbanffy 2y agoTry again. What do you have to lose?
- consumer451 2y agoI have listened to many interviews with Andy, and he has mentioned that raising wasn't as easy as he expected given the team. If possible, could you share the reasons why you passed?
- joshu 2y agoUnfortunately, extremely early-stage investing often relies on vibes more than facts. This is why I kick myself endlessly over missed deals instead of just course-correcting and moving on...
- consumer451 2y agoThat's very understandable. Thanks for the response.