3 ms·
1,600 m vertical depth through hard rock at hydrocarbon extraction bore widths is likely 120 days, onshore @ $15,000 US per day (perhaps) + casing costs + every
by defrost 2y ago
1,600 m vertical depth through hard rock at hydrocarbon extraction bore widths is likely 120 days, onshore @ $15,000 US per day (perhaps) + casing costs + everything else.
YMMV - figure pulled from
Drilling Costs Estimation for Hydrocarbon Wells (2015) https://www.degruyter.com/document/doi/10.7569/jsee.2014.629520/pdf https://www.degruyter.com/document/doi/10.7569/jsee.2014.629...
that's a rough $2 million basement estimation (sans casing + headwork) with many complicating factors that can easily blow it up.
- pjc50 2y agoGiven Hinkley Point C is currently at US$58bn estimated and still not open, a mere $2m for a hole sounds very affordable. Could very quickly spend more than that in meetings.
- defrost 2y agoThat's the bare minimum for a single unadorned hole to that depth (? there's a lot of detail in the linked report, costs may blow up a bit as depth increases, that detail didn't leap out at me). It would cause me no great surprise if "a sufficient hole"; widened, maybe three actual close holes for down pipe, up pipe, and reactor vessel, with casings and head mechanics, came to $50 million. Your point stands, in the great scheme of capital projects of this scale the hole boring and fitting is cheap. Sixteen odd years ago I tracked, with a group, every global mineral exploration activity and subsequent development. When it came time to launch a mine, deemed to be feasible, and raise forward capital for building plant and processing our lower bounds cut off point was $50 million US - anything smaller than that was too small scale to bring to the attention of our subscribers. Capital costs for mining plants, power plants, oil and gas extraction run high - and the G20 costs for nuclear plants are fully in the billions.