4 ms·
Nice! Just not sure how cheap a mile deep bore hole is....
by themaninthedark 2y ago
Nice! Just not sure how cheap a mile deep bore hole is....
- martijnarts 2y agoSomewhere up to $5 million, according to this r/AskEngineering thread: https://www.reddit.com/r/AskEngineers/comments/1dfzwxd/estimating_cost_for_deep_well_drilling_4_miles_or/ https://www.reddit.com/r/AskEngineers/comments/1dfzwxd/estim...
- themaninthedark 2y agoNot as high as I thought it might be, as long as it is less costly than the containment vessel that they are looking to replace it would be a net.
- daneel_w 2y agoWhich as with everything else in construction these days ultimately ends up taking twice as long and costing thrice the initial estimate. Also, this is the cost for a bore hole. The cost for something with enough diameter to house a reactor will be some orders of magnitude higher.
- martijnarts 2y agoThe article mentions 76 cm width for the reactor they're designing, and oil wells can be up to a meter wide[0], so that price estimate would probably be similar then. [0]: https://en.wikipedia.org/wiki/Oil_well#Drilling https://en.wikipedia.org/wiki/Oil_well#Drilling
- defrost 2y ago1,600 m vertical depth through hard rock at hydrocarbon extraction bore widths is likely 120 days, onshore @ $15,000 US per day (perhaps) + casing costs + everything else. YMMV - figure pulled from Drilling Costs Estimation for Hydrocarbon Wells (2015) https://www.degruyter.com/document/doi/10.7569/jsee.2014.629520/pdf https://www.degruyter.com/document/doi/10.7569/jsee.2014.629... that's a rough $2 million basement estimation (sans casing + headwork) with many complicating factors that can easily blow it up.
- pjc50 2y agoGiven Hinkley Point C is currently at US$58bn estimated and still not open, a mere $2m for a hole sounds very affordable. Could very quickly spend more than that in meetings.
- defrost 2y agoThat's the bare minimum for a single unadorned hole to that depth (? there's a lot of detail in the linked report, costs may blow up a bit as depth increases, that detail didn't leap out at me). It would cause me no great surprise if "a sufficient hole"; widened, maybe three actual close holes for down pipe, up pipe, and reactor vessel, with casings and head mechanics, came to $50 million. Your point stands, in the great scheme of capital projects of this scale the hole boring and fitting is cheap. Sixteen odd years ago I tracked, with a group, every global mineral exploration activity and subsequent development. When it came time to launch a mine, deemed to be feasible, and raise forward capital for building plant and processing our lower bounds cut off point was $50 million US - anything smaller than that was too small scale to bring to the attention of our subscribers. Capital costs for mining plants, power plants, oil and gas extraction run high - and the G20 costs for nuclear plants are fully in the billions.