6 ms·
NASA cancels $450M mission to drill for ice on the Moon
- hughes 2y agoI'm all for avoiding sunk-cost thinking, but considering that nearly half a billion was spent on this thing and its launch was barely a year away, it's hard to wrap my head around scrapping it entirely. From the lost talent alone, this seems catastrophic - why would any of the country's best engineers want to work on ambitious NASA projects when they can be rug-pulled so close to completion? Also, where's the accountability or at least lessons learned in this cancelation? Is there a single finding on how to reduce cost overruns for future missions?
- dylan604 2y agoThe Superconducting Super Collider was hoping to get to that "too far along to cancel" point as well. They thought that reaching 80% tunnel completion would do it. However it didn't, and it was canceled. I'm sure there's plenty of other examples as well.
- choilive 2y agoNot entirely on NASA, Congress slashed their budget causing a -$500M hole, with future years budget not looking to fare much better so they had to make some tough decisions. Sounds like other missions in the same program are going to pick up VIPER's objectives though.
- bko 2y agoSure looks like they cut it 2% in 2024, but they've increased it every year over the last 10 years, even in real terms (maybe 2022/2023 was a bit under flat) Year Budget Change 2000 13,428 2001 14,095 4.97% 2002 14,405 2.20% 2003 14,610 1.42% 2004 15,152 3.71% 2005 15,602 2.97% 2006 15,125 -3.06% 2007 15,861 4.87% 2008 17,833 12.43% 2009 17,782 -0.29% 2010 18,724 5.30% 2011 18,448 -1.47% 2012 17,770 -3.68% 2013 16,865 -5.09% 2014 17,647 4.64% 2015 18,010 2.06% 2016 19,300 7.16% 2017 19,508 1.08% 2018 20,736 6.29% 2019 21,500 3.68% 2020 22,629 5.25% 2021 23,271 2.84% 2022 24,041 3.31% 2023 25,384 5.59% 2024 24,875 -2.01% https://en.wikipedia.org/wiki/Budget_of_NASA https://en.wikipedia.org/wiki/Budget_of_NASA
- zamadatix 2y agoIn real terms that looks pretty flat for both the last 10 years and since the beginning of the list. Doesn't explain the project cut but also isn't really real budget growth either.
- bryanlarsen 2y agoThe problem is that most of that budget is earmarked for huge money-wasters like SLS, and those earmarks are growing. So the non-earmarked budget shrinks.
- xenadu02 2y agoThis is a huge part of it. Congress might increase the budget by 3% but when they force something like SLS on NASA that eats 6% of the budget in real terms it was a 3% cut. And this assumes the employees don't deserve any raises or bonuses.
- Retric 2y agoYou’re looking at the Nominal Dollars (Millions) column which is meaningless. The 2023 Constant Dollars (Millions) has 2010: 26,162 2015: 23,150 2020: 26,559 Then the actual budget in 2023 is down to 25,384, and 2024 is 24,124 a 5% cut from the year before. https://www.usinflationcalculator.com/ https://www.usinflationcalculator.com/
- bobmcnamara 2y ago> From the lost talent alone, this seems catastrophic - why would any of the country's best engineers want to work on ambitious NASA projects when they can be rug-pulled so close to completion? That's the point! By making government dysfunctional we can point out all the wasted funds and slash the budget /Reagan
- hansvm 2y ago> avoiding sunk-cost thinking The past is in the past. The half a billion matters insofar as it's given us our current playing hand. The right mentality is some combination of looking forward (we have many options, some of which were bought for half a billion, but even those might be worthless), backward looking (half a billion is probably worth having a retro over; was the outcome regrettable? If so, how can we do less of that?), and keeping non-obvious systemic effects in mind while doing both of those things (e.g., if you never finish a project, it doesn't matter if you were always working toward the "right" thing, and with that sort of thing in mind your bias toward cancelling projects should perhaps be weaker than the immediate facts might indicate). Imagine you'd invested half a billion in Theranos. You really would have pennies on the dollar in return, and completely scrapping it (or otherwise selling it for parts) could be a logical move. The sunk cost fallacy comes in when you decide that because you've already invested you need to continue in that direction. Your point about it being hard to wrap your head around scrapping it entirely is a little subtle. We very well might have bought something worthwhile for that half a billion. In that case though, you still want to look at the resources you _currently_ have available or expect to have in the future, not the fact that you lost a half billion (except insofar as you can use that as a learning experience to not fuck up so much in the future).
- bryanlarsen 2y agoThe original approval for VIPER was $433M. So at one time they thought that VIPER was worth $433M. Now they need $100M+ to finish it. If it was worth $433M at one point, surely it's worth at least $100M now?
- hansvm 2y agoThat was $433M with less information than they have now. To be clear, my personal bias is that there's some sort of graft or other major problem, and it would be worth $100M, but we might have also spent that money as a high-risk, high-reward endeavor and simply found out later that the rewards aren't worth it. That isn't even necessarily a bad outcome, if true.
- omneity 2y agoWith the recently discovered caves in the moon[0] I always thought this particular mission had unfortunate timing since the caves are pretty far from the south pole. Maybe its cancelation is for the best after all. Huge sunk cost though, it might lower confidence in future budget talks. 0: https://www.space.com/moon-cave-lunar-exploration-radar-images https://www.space.com/moon-cave-lunar-exploration-radar-imag...
- dylan604 2y agoIt could be a win-win. Just imagine if NASA canceled the Starliner before it launched. Boeing could have been saved the embarrassment they are currently enduring, but they weren't so lucky to have their project canceled.
- Alupis 2y agoWhile NASA helped fund development and lend expertise, Starliner is not a NASA project to cancel. It's a Boeing/ULA project, and it's likely in Boeing/ULA's interest to develop manned space flight capabilities regardless of what NASA's needs might be today or in the near future.
- dmix 2y agoThat's a very optimistic view on the history of the project. Of course Boeing wants to compete for these huge contracts and they'd love to have it be sustainable outside of singular NASA projects, but that still doesn't make it the reality of the situation.
- Alupis 2y agoThere's a lot more parties interested in putting things and people into space than just NASA...
- mxxx 2y agohttps://youtu.be/SAsgN_LPWBc?si=sRPm9YFXMr4lIcbt https://youtu.be/SAsgN_LPWBc?si=sRPm9YFXMr4lIcbt
- AcerbicZero 2y ago450M just for building the robot seems a bit steep; its not like they're actually getting it to the moon for that price. How much cheaper is it than just sending 3 dudes in a tin can to just dig the holes themselves? Edit: I guess NASA says manned missions will cost billions. Still seems like half a billion is a lot for a glorified DJI drone thats only gotta make it to the moon lol. Regardless, money spent towards any space project tends to be money well spent, so compared to all the other spending I'd like to complain about, this isn't even on the radar.
- esalman 2y agoThe risk of losing 3 dudes is greater than $450m.
- AcerbicZero 2y agoRisk avoidance has its place, but fear didn't get us to the moon the first time and I'm confident it wont work this time either.
- ahmeneeroe-v2 2y agoYou're probably right in this specific example, or at least you're probably in-line with NASA's leadership's thinking. I am willing to bet that other parts of society (e.g. traffic planners and automobile manufacturers) have a much lower cost of human life.
- __s 2y agoFor NASA the cost of dead people includes bad PR
- rvnx 2y agoNot really, SpaceX would just sell that as an unscheduled disassembly + “we collected data”. It’s widely accepted that you may die going to space in experimental vehicles, nobody ever said it would be safe, and nobody can reasonably think it is risk-free. Apollo 1 folks died, not a problem for reputation of NASA.
- zackfield 2y agoseems like we don't have any active or planned missions to land on the moon anymore. bummer. (happy to be proven wrong) https://www.nasa.gov/missions/?terms=10828%2C10873%2C10900%2C13147 https://www.nasa.gov/missions/?terms=10828%2C10873%2C10900%2...
- rvnx 2y agoArtemis III will land on the moon (not before 2027 though). Maybe faster if someone has an old spare Gameboy to lend to them.
- dvdbloc 2y agoWhen a project like this is cancelled, where does the hardware go? Not just flight hardware which I’m sure is ITAR EAR restricted but also the plethora of test and supporting hardware to go along with it?
- trhway 2y agoI think with SpaceX we have the situation similar to computing - ie. whether to start a 20 year computation today on a $1B hardware or wait 5 years and complete it in 5 years then on a $100K hardware - to proceed to fund the $450M+ for the many years ahead or just wait a couple years until SpaceX gets to it and has it done for $10M in half a year.
- ortusdux 2y agoPrevious discussion: https://news.ycombinator.com/item?id=40991699 https://news.ycombinator.com/item?id=40991699 I'll note that it sounds like they were relying on a 3rd party to make their descent module, but it won't be ready in time. So if they were to go ahead with the launch they wouldn't have a way to land the thing.
- deleted 2y ago[deleted]
- ungreased0675 2y agoI’m sure there’s more to the story, but half a billion dollars seems like a staggeringly expensive price tag for one piece of a moon mission. What does all that money go to? What’s the ROI? We’ve been sending rovers to other planets for decades, so I assume there’s a good base of knowledge to build on. This isn’t basic research level, it seems like it should be a lot closer to production work. Satellites go up nearly every day, so I’d guess the space-spec supply chain is healthy. Do post-mortem documents get published on programs like this? I really can’t understand it.
- fshbbdssbbgdd 2y agoWe can spend $300M dollars to grade-separate one intersection between a road and a train.
- bumblebeast 2y agoMust be the alien base on the moon