3 ms·
Weird… I would have called most of those diagrams “Design” not “Implementation”. This is how I work - draw a Control Flow Diagram as the design, implement it i
by alfiedotwtf 2y ago
Weird… I would have called most of those diagrams “Design” not “Implementation”.
This is how I work - draw a Control Flow Diagram as the design, implement it in actual code, then test the code against the diagram.