2 ms·
"takes 1 month to build an MVP " If the MVP actually takes 3 months, X = $8/hr (rounded). My point is: OP needs to clarify the kind of application he wants to
by yashchandra 14y ago
"takes 1 month to build an MVP "
If the MVP actually takes 3 months, X = $8/hr (rounded). My point is: OP needs to clarify the kind of application he wants to build for <8K.