4 ms·
IIRC from one of the whistle-blower accounts, the main issue was that the Boeing computer system only had an option for fully removing the door, which wasn't do
by stoobs 2y ago
IIRC from one of the whistle-blower accounts, the main issue was that the Boeing computer system only had an option for fully removing the door, which wasn't done, only a partial removal to allow access to the parts needing work. There was then a disjoint between the Spirit work system and the Boeing one which resulted in someone saying "fuck it" and skipping it.
Let me see if I can find the account again.
- stoobs 2y agoEh, slightly faulty memory on the details, but it's here: Part 1 - https://leehamnews.com/2024/01/15/unplanned-removal-installation-inspection-procedure-at-boeing/#comment-509962 https://leehamnews.com/2024/01/15/unplanned-removal-installa... Part 2 - https://leehamnews.com/2024/01/15/unplanned-removal-installation-inspection-procedure-at-boeing/#comment-509963 https://leehamnews.com/2024/01/15/unplanned-removal-installa... Still a clusterfuck all around though.