144 ms·
They did for my project. Code compliance number driver of cost by a longshot in change of use renovation project. The sprinkler system and the 4’ vertical lift
by detourdog 2y ago
They did for my project. Code compliance number driver of cost by a longshot in change of use renovation project. The sprinkler system and the 4’ vertical lift cost as much as the 12,000 sq foot building on 1 acre.