4 ms·
Based on the instruction set extensions supported, the design of Lunar Lake has been started later that the designs of Arrow Lake and Arrow Lake S. When first
by adrian_b 2y ago
Based on the instruction set extensions supported, the design of Lunar Lake has been started later that the designs of Arrow Lake and Arrow Lake S.
When first announced, Lunar Lake was supposed to be manufactured by an Intel CMOS process that will be available only in 2025 (18A).
At some point, Intel has decided to retarget Lunar Lake for the TSMC "3 nm" process, and it appears that this decision has allowed them to be ready for product launch much earlier, so it might be launched before Arrow Lake and Arrow Lake S (the latter of these 2 is a desktop CPU that will also be made in the TSMC "3 nm" process, according to rumors).
At Hot Chips 2024, Intel is scheduled to make a more detailed presentation of Lunar Lake.
- mmaniac 2y agoAlso, apparently low end (mobile?) Arrow Lake CPUs will use 20A while higher end will use 3nm. It's not looking good for Intel foundries.
- ac29 2y agoXeon 6E launched this week on the Intel 3 process. Benchmarks of production silicon look good for performance but especially good for performance per watt. Definitely competitive with AMD.