2 ms·
"Starliner is reusable, with each capsule designed to fly as many as 10 missions." Now that's an optimistic statement. Do each of the aborted launch attempts c
by dylan604 2y ago
"Starliner is reusable, with each capsule designed to fly as many as 10 missions."
Now that's an optimistic statement. Do each of the aborted launch attempts count against the tally? If so, this first one is about done. <snicker>
As I see it now, it doesn't look like it is designed to fly at all.
- throwup238 2y agoI think that’s 10 reentries for the capsule but the heat shield would have to be inspected and refurbished every time anyway. The rocket goes through a whole process every time a launch is scrubbed to make sure nothing goes wrong from thermal expansion after the cryogenic fuels are pumped back out.
- TrainedMonkey 2y agoIt's complicated (in a way that makes it worse). Capsules need 6 months happy path refurb - "reusable up to 10 times with a six-month turnaround time" (see https://en.wikipedia.org/wiki/Boeing_Starliner#Spacecraft_characteristics https://en.wikipedia.org/wiki/Boeing_Starliner#Spacecraft_ch... ). This means that some components such as pressure section are qualified for 10 flights, but others are expected to be replaced sooner. The actual refurb will be a lot longer unless they have a lot of flights to dial that in. The real problem with Boeing is lack of testing / iteration. This is the company that perfected "paperwork milestones" - where they prove that they in theory can do something. This is supposed to be exhaustive, but theoretically validating things scales abysmally with complexity. Originally designed to speed up progress by claiming credit for work done previously this devolved into current state of affairs. I want to emphasize that from maximizing shareholder value which is the mode Boeing operated since the McDonnell Douglas merger I believe this to be a good short and maybe even medium term strategy. This is because of cost plus / a lot of programs get cancelled environment Boeing enjoyed and lower risk of milestone payment delays. AKA, if you test something and you find an issue you risk blowing up schedule now, but paperwork milestones guarantee payments and delay risk of finding out something is wrong. Boeing would have probably keep getting away with this, but new age / more agile aerospace companies showed up. Not only they sucked up all of the talent, but also the only way to survive was to iterate and iterate fast... so they did. Source: worked in the field for 10 years.