9 ms·
Sam Altman-backed nuclear startup signs major data center contract
- Flatcircle 2y agowhat could go wrong
- hannob 2y agoGosh am I annoyed by these bullshit energy startups. They want to sell a PPA? For a technology for which they don't even have a working prototype? That has never produced a single kwh of energy? That's like... step 200 before step 0.5.
- j4hdufd8 2y agoThis is what venture capital is, why u so mad?
- ViewTrick1002 2y agoProve it. Deliver value from the venture capital and reap the profits. These companies tend to try survive on public money and grants while not delivering anything. Then when the last deadline finally passes the project is cancelled like what happened with NuScale.
- danielmarkbruce 2y agoI too can sign a non-binding letter of intent to buy a bajillion kwh sometime in the far off future.
- rightbyte 2y agoIs it really a good idea to give Sam Altman access to nuclear fuel? His followers seem sect like.
- bigstrat2003 2y agoMore importantly, Altman basically screams "sociopath". He's nowhere close to someone who should be trusted with dangerous items.
- Zigurd 2y agoBoth AI data centers and new-generation nuclear tech are prestige investments so arguing about need and appropriateness is beside the point. Paying large premium to have a carbon neutral AI is going to go unquestioned. But there is still a potential snag: Is it insurable?
- surfingdino 2y agoSlightly off-topic, but what is more profitable: energy generation (power plants) or electricity distribution (the grid)? Would love to hear from those who watch this space.
- jncfhnb 2y agoDistribution prices tend to be governed by regulators. A solar plant is very profitable to run right now. Probably that.
- surfingdino 2y agoSo the grid operators are restricted, but power plant operators are free to set energy prices?
- jncfhnb 2y agoI think it’s typically an auction system so generally speaking you expect the plants with the cheapest energy to undercut the rest. Off the top of my head I’m not sure how concerns of collusion are dealt with when there’s few participants. There’s probably some sort of regulatory stick in there.
- surfingdino 2y agoI was under impression that the grid operators would have more leverage over power plants when it came to setting prices, after all, if you cannot send your output t the customers, you are sort of stuck with it.
- jncfhnb 2y agoGrid operators are obligated to provide electricity by regulators. I imagine they don’t get a whole lot out of that monopsony
- echelon 2y ago> signed a non-binding letter of intent Does this mean anything at all? Sounds like the equivalent of "cool story, bro" from the signing party. Without committed financial skin in the game, isn't this just a dog and pony show?
- phs318u 2y ago"You have my word, and as everyone knows, my word is my bond!"
- foobarqux 2y agoYes, it's just marketing.
- PaulHoule 2y agoMarketing is the interface to the consumer and includes everything from deciding what you think customers will want and how to design the product to that to how you service the product in the field. It’s not a synonym for “bullshit” although marketing can be bullshit as much as any kind of investor communications or PR, either of which is a better description of this article.
- jgalt212 2y agoFurthermore, if fusion ever works electricity will be too cheap to meter. So why sign a non-binding forward purchase agreement for something that if it works will cost $0?
- exe34 2y agofusion is quite costly in capital isn't it?
- PaulHoule 2y agoYeah. Personally I think the most plausible fusion power plant is https://en.wikipedia.org/wiki/Heavy_ion_fusion https://en.wikipedia.org/wiki/Heavy_ion_fusion which is like laser fusion but 10-100x more efficient in terms of wall plug to energy delivered to the pellet and also capable of multiple shots per second compare to laser systems that are doing good if they fire a few times a day. Nobody is interested in developing it because the high energy requirement for the ion beams to transfer energy effectively into the pellet means you need multiple big accelerators so you can’t demonstrate it at less than a full scale power plant. Such a thing would cost about 1/10 of what a certain billionaire spent to buy a washed up social network. Advanced particle accelerators are an area that could be proliferation sensitive and I think you might get some trouble if you tried to advance the technology. For instance a particle accelerator that drives a spallation neutron source could be used to make Plutonium with a smaller thermal footprint than a nuclear reactor. For that matter, a D+T fusion reactor produces copious very high energy neutrons which would be great for making Pu239 or U233.
- islewis 2y ago> GPT-6 might need about 10% of the world’s computers, a large power plant’s worth of energy ... Probably this looks like a town-sized data center attached to a lot of solar panels or a nuclear reactor. > GPT-7 might need all of the world’s computers, a gargantuan power plant beyond any that currently exist ... Probably this looks like a city-sized data center attached to a fusion plant. Snippet from Astral Codex Ten's article "Sam Altman Wants $7 Trillion". https://www.astralcodexten.com/p/sam-altman-wants-7-trillion https://www.astralcodexten.com/p/sam-altman-wants-7-trillion
- zelias 2y agoFactorio vibes intensify...
- JumpCrisscross 2y ago> Snippet from Astral Codex Ten's article "Sam Altman Wants $7 Trillion" I guess $10 trillion is the next B.S. number you have to throw out to get PR points.
- loceng 2y ago[flagged]
- JumpCrisscross 2y ago> they'll just need to use fear mongering to manufacture consent with the tax base There is zero evidence this has occured. To the degree Altman et al's doomsday fundraising had regulatory effect, it hasn't been in the form of subsidies but onerous rulemaking.
- ideonexus 2y agoI realize this headline means nothing, but there is something to nuclear power futures. I live in Northern Virginia and my recent 20 mile bike ride in Loudon county was nothing but massive datacenters and crisscrossing powerlines to support them. The western side of neighboring Prince William County is now being consumed for data centers. The Washington Post recently had an article on how the demand for electricity for these centers is getting so desperate that they are running powerlines deep into West Virginia and bringing coal plants back online to meet the demand. Estimates are that it's going to take multiple nuclear powerplants to meet future demand in just this locality. I have very mixed feelings about this. I love the possibilities of all these datacenters and their potential, but I'm worried about the massive amount of energy they are consuming. If this is all just so much hype and marketing, then it's incredibly wasteful.
- hannob 2y agoSo your solution is to power these datacenters for another 1-2 decades with coal power while you wait for new nuclear plants? Because that's the realistic timeframe for any new nuclear. Vogtle 3 took 14 years to build. Of course, any "advanced nuclear" that doesn't even have a prototype yet will take longer than that. If it will ever happen.
- halJordan 2y agoDon't know why you're saying "your solution" like that guy is in charge of us energy policy, but Virginia already has nuclear reactors. And Dominion has the permits and plans and facility to construct another 1500 megawatts.
- violet13 2y agoHow many times in history have we regretted over-building this kind of infrastructure? We have no shortage of good ways to use electric energy. If AI turns out to be a fad, others will benefit. Pollution is a concern, but I think don't think that anti-growth or anti-consumption sentiments are useful. All this money pouring in is an opportunity to invest in clean energy.
- dmurray 2y ago
- jweir 2y agoOklo does not have an approved design. They have applied and are awaiting approval. https://www.nrc.gov/reactors/new-reactors/advanced/who-were-working-with/licensing-activities/pre-application-activities/okla-aurora-powerhouse.html https://www.nrc.gov/reactors/new-reactors/advanced/who-were-...
- ViewTrick1002 2y agoThey got laughed out of the room because they couldn’t even give the required information to start the process. https://www.nrc.gov/reading-rm/doc-collections/news/2022/22-002.pdf https://www.nrc.gov/reading-rm/doc-collections/news/2022/22-...
- PaulHoule 2y agoConsidering that they’d filed the first application for a non-LWR in decades I don’t think they did that bad. Still I thought it was a waste that they went on and on about the risk of supervolcanos and never said what they would do if the sodium coolant caught on fire. (Not that hard to answer, necessarily as you can detect it, drain water if is involved, and put the fire out…. But you’ve got to have some answer for an SFR.)