3 ms·
I've been in orgs where it's up to engineering to measure that, and it's treated as a failure of engineering if they're not positive.
by Macha 2y ago
I've been in orgs where it's up to engineering to measure that, and it's treated as a failure of engineering if they're not positive.
- flockonus 2y agoYes, as most orgs using ORKs that tends to be the case; so yes, same in my observation.