4 ms·
What a weird reference to take. It should be obvious they're talking about pre-fukushima capacity. Which was 141 TWH in 2010 and would have more than replaced
by athrowaway3z 2y ago
What a weird reference to take.
It should be obvious they're talking about pre-fukushima capacity.
Which was 141 TWH in 2010 and would have more than replaced the entire brown&hard coal use for 2023.
https://www.statista.com/statistics/1330065/gross-electricity-generation-by-source-germany/ https://www.statista.com/statistics/1330065/gross-electricit...
- martin_a 2y agoWhat a weird reference from you. Fukushima is long gone and decisions were made at that time by the government at that time to phase out of nuclear power generation for multiple reasons. That's the situation to work with, anything else is superfluous.