12 ms·
A site that contained a single NuScale reactor would have unacceptable fixed costs per MW. The UAMPS/NuScale CFPP was planned to have six reactors to amortize
by pfdietz 3y ago
A site that contained a single NuScale reactor would have unacceptable fixed costs per MW. The UAMPS/NuScale CFPP was planned to have six reactors to amortize those fixed costs (like personnel) over more output.
Note also that the cost figures NuScale gave for that was the cost after 40-50 reactors had been built (and with federal subsidy), not FOAK costs.
- justahuman74 3y agoIf you can build N reactors, the datacenters will suddenly appear nearby if they're allowed to. Power is the current bottleneck in the US