Once installed, the bridge can be driven along the road when a 100m segment is finished
by Plankaluel 3y ago
Once installed, the bridge can be driven along the road when a 100m segment is finished
- ssl232 3y agoPresumably the road has to be closed for the bridge to travel? I assume this takes place at night.
- tantalor 3y agoThat probably just takes a few hours, easy to do. And you can start/stop a few times to let cars go over.
- giantg2 3y agoIf it's moved slowly enough, I don't see why traffic couldn't drive on it.
- phire 3y agoI guess it's theoretically possible to engineer a bridge that can move with traffic on it. But this bridge is engineered with solid feet for taking traffic loads. The wheels are only extended for movement and wouldn't be able to take the load of traffic.
- deleted 3y ago[deleted]
- shikon7 3y agoDuring the night, there will be 1 lane open in each direction (one on the side of the bridge, and one on the opposite carriageway), so the bridge can be moved.
- kinnth 3y agooh this is cool. I did think for a 2 day setup and 1/2 day takedown it wasn't a huge efficiency saving but it is if you move it down the road at the same time. As the comment above mentions, safety is a huge factor too.