3 ms·
Well, the cost estimate for ARC was $29/W(e,net) for the capital cost of the reactor, or about 2x the cost of Vogtle-3/4 (for entire power plants).
by pfdietz 3y ago
Well, the cost estimate for ARC was $29/W(e,net) for the capital cost of the reactor, or about 2x the cost of Vogtle-3/4 (for entire power plants).